11/27/2011

NEXT POST
Fortress Laying The choice of these profiles is rich - they differ in both size and color, so choose a few good options. Incidentally, the floor also have such profiles, only the metal. They helps organize the various steps and changes in levels, in general, are used where plastic profiles will wear very quickly. Fully tiled glue dries, usually within three days, then the solution Fortress is not gaining. After laying there is still a procedure - the grout joints between tiles, it is optimal to start the day after installation to allow the glue to get rid of excess water through the gap between tiles. Grout trowel produced a huge number of compounds that differ in properties as well as in color. At 24 hours after laying of wall tiles, you can begin to fill joints, Using putty for joints required tsveta.Zapolnyaem joints with a rubber spatula. Excess solution and collect again fill the seams. When the solution dries out a little over (15 - 30 minutes), after my surface, collecting excess grout and tile cleaning. This work was performed using a sponge (large pores), slightly dampened with plain vodoy.Soedinenie between the wall and floor in rooms with high humidity (bathroom, etc.) should be filled with a material which provides sealing seam. For this purpose suitable silicone sealing mass. Weight in excess applied to the seam. With the help of a manual spray silicone mass with adjacent surface of the tiles wetted with water with the addition of soap. This prevents moisture bonding silicone water masses to the surface of tiles. Remains of silicone collect a special tool, which remove excess silicone seam gives the desired shape. And, lastly, to read very well, but if you're really interested in this article, you can also watch a video on laying ceramic tile...
PREVIOUS POST
Construction Works What would be finishing work you did not do, whether it be leveling, decontamination of surfaces, wallpapering, tiling or screed floor, you need to prepare the surface. Therefore, in this case you can not do without primers. Primer - a sure remedy for a variety of decorating. The primer solution promotes reliable bonding of finishing material to the base surface. But that was the result of your work high enough to use only reliable primer. Because of poor quality can lead to wet and peel treated surface. In addition, for various works to use a certain type of primer. Today the distinction alkyd, acrylic, glyptal, perchlorovinyl, polyvinyl acetate, phenolic and polyester primer. Let us consider in more detail each type. Alkyd primer perfectly suited for wood before painting. This primer creates a dense layer of matte color, thereby increasing the final surface color. Dries, this primer for 12 - 15 hours. Alkyd Primer should not be applied to plastered or plaster surface. Acrylic primer used to prepare almost any surface. It has significant advantages over other types: practically does not smell and dries quickly (2-4 hours). The only disadvantage of acrylic primer is that it does not protect against corrosion. Therefore, according to the composition in any case can not blot the surface of ferrous metals. Glyptal primer used for the treatment of surfaces in dry conditions. It is also perfectly suited for the processing of metallic surfaces. Complete drying time is 24 glyptal primer hours. Perchlorovinyl primer applied as a coating of metal, concrete and masonry surfaces. Perchlorovinyl dries fairly quickly, within one hour. But to use such a composition for interior decoration not recommended due to the content in it are harmful to human health. PVA formulations used before applying the paint with the same title. This dries...